The residential area is 75% complete. Additional

trees will be placed, accessories and of course snow as the final step. The following pictures show the

progress of this area.

Looking down the South side of Park Circle Drive

Doctor's House

North Loop of Park Circle Drive

Looking West from Mayor's house drive way

View after additional accessories have been added

Fence crews have been busy as has the power and light department

More fence and decorations added

A fountain has been added to the circle drive at the Mayor's house.

Another view

The placement of additional boards have been set down. This is an entirely different design than what was put on paper.

Another view

More buildings have been placed however this is not the final layout of the town

Buildings will be placed then replaced for the best design

The open space shown in this and the next picture will be a moutain area. The hospital, monostery, and country church will be in

this area.

On the opposite side (left) will be the recreational area. The train will pass through two tunnels in the mountains. We are still

working on the track layout which is proving to be a very big challenge this year.

Be sure to check back for future updates.

Click Here for Previous Page