The residential area is 75% complete. Additional
trees will be placed, accessories and of course snow
as the final step. The following pictures show the
progress of this area.
Looking down the South side of Park Circle Drive
Doctor's House
North Loop of Park Circle Drive
Looking West from Mayor's house drive way
View after additional accessories have been added
Fence crews have been busy as has the power and light
department
More fence and decorations added
A fountain has been added to the circle drive at the
Mayor's house.
Another view
The placement of additional boards have been set down.
This is an entirely different design than what was put on paper.
Another view
More buildings have been placed however this is not
the final layout of the town
Buildings will be placed then replaced for the best
design
The open space shown in this and the next picture will
be a moutain area. The hospital, monostery, and country church
will be in
this area.
On the opposite side (left) will be the recreational
area. The train will pass through two tunnels in the mountains.
We are still
working on the track layout which is proving to be
a very big challenge this year.
Be sure to check back for future updates.