Day Two of Construction

We have painted two of the base boards white and placed some rocks and snow drifts nearby.

Additional clouds have been seen in the Southern sky

The start of a road from the upper level to the next one is between the rocks

The water tower for the City of Heather Ridge has been installed

Press your Back Button to return to the previous page